Forums The Vibe Chat Hot Hot Heat

Viewing 2 posts - 26 through 27 (of 27 total)
  • Author
    Posts
  • #1078632
    BioTech
    Participant

      To be fair, if it’s outdoors we can usually do it in about 45 mins.

      Stairs and clubs are different though, and there is only usually 3 of us doing the clubs.

      It’s about 15k there, but we are selling most of that now to upgrade.

      Just remembered you said yours is active too. Cuts out a hell of a lot of work rigging and de-rigging I should imagine. Simply coiling up the cables takes us bloody ages in a club.

      #1078651
      Raj
      Participant
        BioTech wrote:
        Just remembered you said yours is active too. Cuts out a hell of a lot of work rigging and de-rigging I should imagine. Simply coiling up the cables takes us bloody ages in a club.

        can be unplugged in 2 mins flat and packed inside of 5 at a pinch :crazy_fre mind you i normally take longer than that if i dont have to rush:crazy_fre

        all the cables are coiled into the flight cases too and mostly the equipment is hardwired with sockets on the sides of the flight cases into which the cables to speakers etc plug; its lush from a packing point of view:bigsmile:

        just need to label all the cables and i will be totally OCD wrt packing/unpacking the rig :bigsmile:

      Viewing 2 posts - 26 through 27 (of 27 total)
      • You must be logged in to reply to this topic.

      Forums The Vibe Chat Hot Hot Heat